Skip to content Skip to content
HeavyDuty USB Type C Charging Cable Braided Fast Phone Charger Long Lead 2m 3m
Brand new only Source offer

HeavyDuty USB Type C Charging Cable Braided Fast Phone Charger Long Lead 2m 3m

Brand-new Cables from the source. Detected listing fit: Universal / phone-compatible. We show the current tracked offer, seller details when available, and the fit signals detected from the listing title so you can verify before leaving CheapCellPhones.

Current tracked total Check current price
Category
Cables
Subcategory
USB-C cable
Condition rule
New / eBay condition ID 1000
Item price
Check source
Shipping shown
Check source

Models and fit signals

Detected listing fit: Universal / phone-compatible.

  • Check connector type on both ends, cable length, wattage rating, and whether it supports data transfer.
  • CheapCellPhones imports only brand-new accessory offers, but the final fit and purchase terms must be confirmed on the seller page.

What to verify before buying

  • Confirm connector type, wattage, and whether the listing includes the cable or adapter you need.
  • Confirm the product title and photos match the accessory you need.
  • Check seller return policy and delivery date before checkout.
  • Make sure the final checkout total still matches the offer shown here.

Before buying

Confirm exact fitCases and screen protectors can differ by model, size, port, and camera layout.
Review shipping and returnsFinal shipping cost, delivery timing, and returns are set by the supplier.
Use the source checkoutThe purchase is completed at the supplier website, not on CheapCellPhones.com.

CheapCellPhones may earn a commission if you buy through a source link. That does not change which items appear on this page.

We may earn a commission from qualifying purchases. Prices, shipping, seller terms, and availability can change.